THUMS Drilling Engineering and Process Improvement
Client: THUMS Long Beach Company
InterAct is providing drilling engineering expertise for various wells drilled from the THUMS Production Islands in Long Beach Harbor. The following work is ongoing:
- Cost estimates and drilling feasibility evaluation for deep drilling project.
- Customized cost estimating program and performance tracking “scorecard” for drilling projects.
- Working with drilling management team to improve drilling practices and processes at THUMS.
- Technical limit analysis management.
- Risk-based anti-collision procedures using COMPASS directional drilling software.
PXP Platforms Hidalgo and Irene Drilling Projects
Client: PXP / Arguello Inc.
InterAct prepared engineering specifications and procedures for installation of additional 24” conductor casings on Platform Hidalgo to support the Rocky Point extended reach drilling project. Our management responsibilities included procurement, welding, and coating of 24” conductor casings.
InterAct personnel managed the inspection and evaluation of Platform Irene drilling rig, including derrick, substructure, drawworks, top drive, mud pumps, mud pits, BOPE, and electrical generators/SCR. We developed the cost estimate to refurbish Platform Irene drilling rig and provided Drilling Supervisors to oversee the construction as well as operations.
Pleito Drilling Engineering, Facility Design, Permitting, and Construction Management
Client: Legacy Energy
Utilizing our broad suite of services, InterAct is providing Legacy Energy with the regulatory, engineering, and operations support necessary to execute the enhanced oil recovery efforts at the Pleito Creek field in Kern County, California. From the initial stages of due diligence and permit evaluation, InterAct has continued its partnership with Legacy on this cutting-edge in-situ combustion project providing detailed horizontal well casing design, facilities engineering, and construction management. Our skilled operations and safety personnel effectively manage field development and production activities as the contract operator for Legacy.
Completion Engineering – UK Land Well
InterAct carries out completion engineering for onshore and offshore wells, and has recently been involved with a UK land well to be used for gas storage. We developed the design and equipment specification, managed the equipment procurement and wrote the installation programme.
Following the installation of the well completion, InterAct wrote the well clean-up and test programme for bringing the well into production.
South Belridge Facility Design, Permitting and Construction Management
Client: Orchard Petroleum
InterAct managed a $5M oil processing facility expansion from foundations to commissioning for Orchard Petroleum. The scope of work included vendor bid evaluation, piping design, project scheduling, permitting and engineering coordination.
InterAct designed a solar powered, wireless tank control system with Internet interface for remote monitoring and operator notification. Implementation of process solutions provides our clients with turnkey support.
Venoco Platforms Gail and Holly Drilling Engineering
Client: Venoco Inc.
InterAct provided drilling engineering expertise for Venoco’s Platform Gail and Platform Holly redrill and completion projects. Specifically, we prepared plugging and slot recovery procedures, designed open hole and cased hole gravel packed completions, developed well designs, analyzed torque and drag, and prepared cost estimates for extended reach drilling opportunities. In addition, InterAct prepared NPDES discharge reports for drilling and workovers. InterAct’s Drilling Supervisors were brought in to oversee the construction efforts as well as operations. We also provided Offshore Crane Operators and Certified Riggers throughout both drilling projects.