Legacy Energy Willow Draw Project

In November, 2010, InterAct conducted an assessment of the Willow Draw oil production facility in the Big Horn Basin region of Wyoming.  Legacy Energy, a subsidiary of NiMin Energy, requested the assessment to determine the capacities of the existing equipment to process additional production and to make recommendations for modifications to the facility should equipment be undersized.  As part of this facility assessment, InterAct developed a process flow diagram for the Willow Draw facility to document the existing equipment specifications, piping design and controls.

As a follow up to our production assessment report of Willow Draw, Legacy Energy requested InterAct to develop specifications for new equipment, inspect and calculate flow capacities for used equipment, design improvements for existing equipment, prepare AFE estimates and provide project management oversight.  The project is now in the third phase of improvements with a fourth phase planned for 2012.